2021-09-03   ELECTROMECHANICAL MAINTENANCE AND CIVIL WORKS FOR THE ENAGÁS BUILDINGS (ENAGAS, SA)
Preventive, corrective, technical-legal and conductive maintenance service, related to the existing facilities in Enagás buildings, and, as well as the management of the service and its optimization. Location: Spain Ver la contratación »
2021-06-18   Acquisition of Turbine Type Flowmeters with Extended Range (ENAGAS, SA)
Acquisition of turbine flowmeters of different sizes and ANSI for the measurement stations. Turbines must have an extended range (>1:20) for metering, and approved by the corresponding European Notification Body. Ver la contratación »
2021-06-04   Manufacture, Supply and Commissioning of 45 kV Cells, Single Bar, for the Project to Replace TC103 by MC103 at EC Coreses (ENAGAS, SA)
Supply of two groups of 45 kV cells, single bar, with the following characteristics: — Group 1: 3 cells standardized by Iberdrola, with automatic switch for line input and output and diversion to a new supply line to EC Coreses, — Group 2: 1 line input cell, 1 output cell with circuit breaker or disconnector and 1 cell for fiscal measurement. Ver la contratación »
2021-05-19   New Cryogenic Boil-off Gas (BOG) Unit at Cartagena Regasification Terminal (Spain). Manufacturing and Supply of an... (ENAGAS, SA)
One (1) double-stage electrically driven reciprocating compressor (optionally, a centrifugal compressor can be proposed if certain conditions are met). Specified capacity = 12 tBOG/h. Compression ratio = 10.51/1.090 (bara/bara). Ver la contratación »
2021-04-29   Castor Underground Gas Storage (Castellón). Wells Plug and Abandonment (ENAGAS, SA)
Waste Management coming from project P&A operations (Administrative management and permitting for transport and waste management purposes; cargo positioning and loading/unloading manoeuvres, waste transportation from the shorebase, short term storage at Vinaròz Port, Castellón). Ver la contratación »
2021-04-29   New Compression Units in Aurín (Spain). Manufacture and Supply of Electric Powered Compressors (ENAGAS, SA)
Four (4) two (2) stage reciprocating compressors. Compression ratio from 33 bar to 160 bar. Electric motor drive. Power 1.1 MW. Ver la contratación »
2021-04-29   Replacement of Baker Serrablo Panels (Spain). Christmas Tree Manufacturing and Supply (ENAGAS, SA)
Four (4) Christmas Tree1 Xmas: 5 1/8 ‘for the Jaca 2 well and 3 Xmas 4 1/8’ for the Aurín wells (S3, S5 and S6) — Design pressure 5000 psi. Ver la contratación »
2021-04-12   Logistics Services Shore Base Abandonment Process Underground Storage Castor Castellon Spain (ENAGAS, SA)
Marine Shore base services, equipment (including mooring, stowage, crane and forklift), personnel and consumables to support abandonment operations. Ver la contratación »
2021-04-12   Platform Supply Vessel (PSV) and Castor Emergency Response and Rescue Vessel (ERRV) Castelllón (ENAGAS, SA)
Platform Supply Vessel (PSV) and Castor Emergency Response and Rescue Vessel (ERRV) Castelllón. Ver la contratación »