2021-11-16   SUPPLY PIPELINE PAJARES (ASTURIAS, SPAIN) (ENAGAS, SA)
Carbon Steel Line Pipe Diameter 20 "Thickness 12.7 mm API-5L Grx60 Polyethylene Liner 3PN Ver la contratación »
2016-02-10   Materiales asociados al Proyecto del Gasoducto Figueras — Frontera Francesa (Enagas Transporte, S.A.U.)
Materiales asociados al Proyecto del Gasoducto Figueras — Frontera Francesa. Ver la contratación »
2015-08-13   Supply of SF6 gas handling and storage plant for the Mitica experiment (The European Joint Undertaking for ITER and the development of Fusion Energy (‘Fusion for Energy’))
The scope of this tender is the supply of the SF6 gas and the gas handling and storage plant for the Mitica experiment, to be delivered and installed at the PRIMA site. Ver la contratación »
Proveedores mencionados: DILO Armaturen und Anlagen GmbH