Cold & Hot Basin & Cooling Towers (67), Pumping Station (68), Heat Exchangers Building (69) and Water Treatment Equipment Building (64)

The European Joint Undertaking for ITER and the Development of Fusion Energy ("Fusion for Energy")

The scope of the contract covers all activities from preliminary design (study of basic documents, development of technical specifications and drawings (Catia models included)) to the construction, testing and take-over by the Employer of the Cold & Hot Basin & Cooling Towers (67), the Pumping Station (68), the Heat Exchangers Building (69) and the Water Treatment Equipment Building (64).
The above includes the foundations, main structure, earthing and lightning protection systems, all finishing works as well as all technical services such as mechanical and electrical.

Plazo
El plazo para la recepción de ofertas era de 2012-11-02. La contratación se publicó en 2012-09-26.

Proveedores
Los siguientes proveedores se mencionan en decisiones de adjudicación u otros documentos de contratación:
¿A quién?

¿Cómo?

Historial de adquisiciones
Fecha Documento
2012-09-26 Anuncio de licitación
2013-09-02 Anuncio de adjudicación de contrato