Technical support on best environmental management practice in the manufacture of fabricated metal products sector
Technical support on best environmental management practice in the manufacture of fabricated metal products sector.
The work will aim at:
— collecting information on best environmental management practices (BEMPs), environmental performance indicators and preliminary proposed benchmarks of excellence,
— prepare a list of experts in the improvement of environmental performance in the fabricated metal products manufacturing sector, which the JRC can involve in the development of the sectoral reference document.
Plazo
El plazo para la recepción de ofertas era de 2014-09-24.
La contratación se publicó en 2014-07-17.
Proveedores
Los siguientes proveedores se mencionan en decisiones de adjudicación u otros documentos de contratación:
¿A quién?
¿Cómo?
Historial de adquisiciones
Fecha |
Documento |
2014-07-17
|
Anuncio de licitación
|
2015-02-05
|
Anuncio de adjudicación de contrato
|