Procurement of a 170 GHZ high-power CW source for the testing of electron cyclotron launcher components

The European Joint Undertaking for ITER and the development of Fusion Energy (‘Fusion for Energy’)

This contract concerns the supply of a microwave source to be procured and installed in the EU EC Component Test Facility (ECT-FALCON). The microwave generator (Gyrotron), its ancillaries and a matching optics unit (MOU) with HE11 waveguide output together constitute a high power microwave source. The Source is required to deliver a reliable high power, long pulse output (170 GHz, 1 MW) relevant to the ITER operating conditions.

Plazo
El plazo para la recepción de ofertas era de 2015-04-14. La contratación se publicó en 2015-03-20.

Proveedores
Los siguientes proveedores se mencionan en decisiones de adjudicación u otros documentos de contratación:
¿A quién?

¿Cómo?

Historial de adquisiciones
Fecha Documento
2015-03-20 Anuncio de licitación
2015-04-08 Información complementaria
2015-09-14 Anuncio de adjudicación de contrato