BLDG 44: approx. 6 000 m3 with nuclear safety requirements, housing the emergency electrical distribution system for train A composed of MV and LV distribution, UPS, chargers and batteries (5 MVAs of electrical power).
BLDG 45: approx. 6 000 m3 with nuclear safety requirements, housing the emergency electrical distribution system for train B composed of MV and LV distribution, UPS, chargers and batteries (5 MVAs of electrical power).
BLDG 46: approx. 6 000 m3, housing the investment protection electrical distribution system composed of MV distribution, LV distribution, UPS, chargers and batteries (6 MVAs of electrical power). Supply of electrical equipment is excluded.
BLDG 47: approx. 6 000 m3, housing the investment protection electrical distribution system composed of MV distribution, LV distribution, UPS, chargers and batteries (6 MVAs of electrical power). Supply of electrical equipment is excluded.
Supply and installation of more than 5 km of cable trays and 20 km of cables.
Plazo
El plazo para la recepción de ofertas era de 2018-05-10.
La contratación se publicó en 2018-02-27.
Información complementaria (2018-04-05) Autoridad contratante Nombre y dirección
Nombre:
“The European Joint Undertaking for ITER and the Development of Fusion Energy ("Fusion for Energy")”
Dirección postal: C/ Josep Pla 2, Torres Diagonal Litoral, Edificio B3, Office 10/23
Ciudad postal: Barcelona
Código postal: 08019
País: España 🇪🇸
Persona de contacto: Contracts and Procurement Unit, for the attention of Mr Niels VAN DE VEN
Teléfono: +34 3201800📞
Correo electrónico: tenders-operational-sb.ps@f4e.europa.eu📧
Región: Barcelona🏙️
URL: http://f4e.europa.eu/🌏
Dirección del perfil de comprador: https://industryportal.f4e.europa.eu/default.aspx🌏
Objeto Alcance de la contratación
Título: Emergency Electrical Power Distribution (TB13)
F4E-OPE-0754
Productos/servicios: Trabajos generales de construcción de inmuebles y obras de ingeniería civil📦
Breve descripción:
“Bldg 44: approx. 6 000 m with nuclear safety requirements, housing the emergency electrical distribution system for train A composed of MV and LV...”
Breve descripción
Bldg 44: approx. 6 000 m with nuclear safety requirements, housing the emergency electrical distribution system for train A composed of MV and LV distribution, UPS, chargers and batteries (5 MVAs of electrical power).
Bldg 45: approx. 6 000 m with nuclear safety requirements, housing the emergency electrical distribution system for train B composed of MV and LV distribution, UPS, chargers and batteries (5 MVAs of electrical power).
Bldg 46: approx. 6 000 m, housing the investment protection electrical distribution system composed of MV distribution, LV distribution, UPS, chargers and batteries (6 MVAs of electrical power). Supply of electrical equipment is excluded.
Bldg 47: approx. 6 000 m, housing the investment protection electrical distribution system composed of MV distribution, LV distribution, UPS, chargers and batteries (6 MVAs of electrical power). Supply of electrical equipment is excluded.
Supply and installation of more than 5 km of cable trays and 20 km of cables.
Información complementaria Referencia del anuncio original
Número de anuncio en el DO S: 2018/S 049-106966
Cambios Texto que debe corregirse en el anuncio original
Número de sección: IV.2.2
Lugar del texto a modificar: Time limit for receipt of tenders or requests to participate
Valor antiguo
Fecha: 2018-05-10 📅
Tiempo: 23:59
Nuevo valor
Fecha: 2018-06-14 📅
Tiempo: 23:59
Texto que debe corregirse en el anuncio original
Número de sección: IV.2.7
Lugar del texto a modificar: Conditions for opening of tenders
Valor antiguo
Fecha: 2018-05-15 📅
Tiempo: 10:00
Nuevo valor
Fecha: 2018-06-19 📅
Tiempo: 10:00
Otra información adicional
“Extension of the submission deadline with reference to the questions and answers available on: https://industryportal.f4e.europa.eu/default.aspx”
Fuente: OJS 2018/S 069-152319 (2018-04-05)
Información complementaria (2018-04-27)
Cambios Texto que debe corregirse en el anuncio original
Número de sección: IV.2.2
Valor antiguo
Fecha: 2018-06-14 📅
Tiempo: 23:59
Nuevo valor
Fecha: 2018-07-18 📅
Tiempo: 23:59
Texto que debe corregirse en el anuncio original
Número de sección: IV.2.7
Valor antiguo
Fecha: 2018-06-19 📅
Tiempo: 10:00
Nuevo valor
Fecha: 2018-07-24 📅
Tiempo: 10:00
Fuente: OJS 2018/S 084-189066 (2018-04-27)
Información complementaria (2018-06-13) Autoridad contratante Nombre y dirección
Nombre:
“The European Joint Undertaking for ITER and the Development of Fusion Energy (“Fusion for Energy”)”
Persona de contacto: Contracts and Procurement Unit, for the attention of Mr Niels Van de Ven
Cambios Texto que debe corregirse en el anuncio original
Número de sección: IV.2.2)
Lugar del texto a modificar: Time limit for receipt of tenders or requests to participate
Valor antiguo
Fecha: 2018-07-18 📅
Tiempo: 23:59
Nuevo valor
Fecha: 2018-09-28 📅
Tiempo: 23:59
Texto que debe corregirse en el anuncio original
Número de sección: IV.2.7)
Lugar del texto a modificar: Conditions for opening of tenders
Valor antiguo
Fecha: 2018-07-24 📅
Tiempo: 10:00
Nuevo valor
Fecha: 2018-10-04 📅
Tiempo: 10:00
Fuente: OJS 2018/S 114-258470 (2018-06-13)
Anuncio de adjudicación de contrato (2018-10-19)
Objeto Alcance de la contratación
Breve descripción:
“Bldg 44: approx. 6 000 m3 with nuclear safety requirements, housing the emergency electrical distribution system for train A composed of MV and LV...”
Breve descripción
Bldg 44: approx. 6 000 m3 with nuclear safety requirements, housing the emergency electrical distribution system for train A composed of MV and LV distribution, UPS, chargers and batteries (5 MVAs of electrical power).
Bldg 45: approx. 6 000 m3 with nuclear safety requirements, housing the emergency electrical distribution system for train B composed of MV and LV distribution, UPS, chargers and batteries (5 MVAs of electrical power).
Bldg 46: approx. 6 000 m3, housing the investment protection electrical distribution system composed of MV distribution, LV distribution, UPS, chargers and batteries (6 MVAs of electrical power). Supply of electrical equipment is excluded.
Bldg 47: approx. 6 000 m3, housing the investment protection electrical distribution system composed of MV distribution, LV distribution, UPS, chargers and batteries (6 MVAs of electrical power). Supply of electrical equipment is excluded.
Supply and installation of more than 5 km of cable trays and 20 km of cables.
The subject of the contract is the provision of works as set out in the procurement documents.
The baseline scope covers:
— Design, construction, supply, installation, test, commissioning, operation and maintenance of the the Emergency Power Supply buildings (PBS 63, Buildings 44 and 45),
— Design, supply, installation, test, commissioning, operation and maintenance of the Distribution Equipment (PIC) in above mentioned buildings (PBS 43, Buildings 44 and 45),
— Design, supply, installation, test, commissioning, operation and maintenance of the 15kV distribution Load Centers (LC15 and LC16).
Ver más Criterios de adjudicación
Criterio de calidad (nombre): Technical award criteria
Criterio de calidad (ponderación): 50
Precio (ponderación): 50
Información sobre opciones
Opciones ✅
Descripción de las opciones:
“The following options are foreseen:
Option 1: Design, construction, supply, installation, test, commissioning, operation and maintenance of the Medium...”
Descripción de las opciones
The following options are foreseen:
Option 1: Design, construction, supply, installation, test, commissioning, operation and maintenance of the Medium Voltage Distribution buildings (PBS 63 Building 46 and 47),
Option 2: Design, installation, test, commissioning, operation and maintenance of the IP Distribution Equipment in above mentioned buildings (PBS 43 Buildings 46 and 47),
Option 3: Supply, installation, test, commissioning, operation and maintenance of PBS 43 cables going out of Buildings 44, 45, 46 and 47,
Option 4: Supply, installation, test,commissioning, operation and maintenance of PBS 43 sub-distribution boards and sub-distribution panel boards,
Option 5: Supply, installation, test, commissioning, operation and maintenanceof PBS 44 cable trays,
Option 6: Fire protection and lighting in galleries,
Option 7: Integrated commissioning support activities,
Option 8: Operation and maintenance after take over.
Ver más Alcance de la contratación
Información sobre los fondos de la Unión Europea: Iter
Descripción
Información complementaria:
“See procurement documents published on the internet address provided in Section I.3.”
Procedimiento Tipo de procedimiento
Procedimiento abierto
Información administrativa
Publicación anterior sobre este procedimiento: 2018/S 049-106966
Adjudicación del contrato
1️⃣
Título: Emergency Electrical Power Distribution (TB13)
Información sobre los no premiados
No se recibieron ofertas o solicitudes de participación o todas fueron rechazadas
“See procurement documents published on the internet address provided in Section I.3.
1) This contract notice and the rest of the procurement documents will...”
See procurement documents published on the internet address provided in Section I.3.
1) This contract notice and the rest of the procurement documents will also be published on the Joint Undertaking's buyer's profile. Economic operators are strongly advised to regularly visit the internet address provided in Section I.3 of this contract notice.
2) This procurement procedure is governed by the rules laid down by (a) Regulation (EU, Euratom) No 966/2012 as amended by Regulation (EU, Euratom) No 547/2014 (‘the Financial Regulation’) and by Regulation (EU, Euratom) 2015/1929; (b) Commission delegated regulation (EU) No 1268/2012 as amended by Commission Delegated Regulation (EU) 2015/2462 of 30 October 2015 (the Rules of Application of the Financial regulation); and (c) complemented, where it derogates, by the Financial Derogation of Fusion for Energy adopted by the Governing Board on 02 December 2015
All applicable legislation can be found on "http://www.fusionforenergy.europa.eu/procurementsgrants/keyreference.aspx"
3) Evolution of the Defined Requirements and changes to the allotment strategy of Fusion for Energy may affect the additional buildings, infrastructures and electrical components under the current contract scope and may require new contract(s) consisting of a repetition of similar services or works entrusted to the economic operator to which the original contract was awarded. In this case, Fusion for Energy may use the negotiated procedure in accordance with Article 134 RAP and the award of the repetition of similar works or services will be subject to the best value for money award method. This procedure may only be used during the performance of the original contract and at the latest during the three years following its signature.
Ver más Órgano de revisión
Nombre: General Court
Dirección postal: Rue du Fort Niedergrünewald
Ciudad postal: Luxembourg
Código postal: L-2925
País: Luxemburgo 🇱🇺
Teléfono: +352 4303-1📞
Correo electrónico: generalcourt.registry@curia.europa.eu📧
Fax: +352 4303-2100 📠
URL: http://curia.europa.eu🌏 Procedimiento de revisión
Información precisa sobre los plazos de los procedimientos de revisión:
“Within two months of notification of the award decision, an action for annulment of the award decision may be launched. Any request made and any reply from...”
Información precisa sobre los plazos de los procedimientos de revisión
Within two months of notification of the award decision, an action for annulment of the award decision may be launched. Any request made and any reply from the Joint Undertaking, or any complaint for maladministration, will neither have the purpose nor the effect of suspending the time-limit for launching an action for annulment or to open a new period for launching an action for annulment. The body responsible for hearing annulment procedures is indicated in Section VI.4.1 of this contract notice.
If you believe that there was maladministration, you may lodge a complaint to the European Ombudsman within two years of the date when you became aware of the facts on which the complaint is based (see "http://www.ombudsman.europa.eu").
Ver más
Fuente: OJS 2018/S 210-479160 (2018-10-19)