The purpose of this service is the provision by Contractor to ENAGAS, upon request of the latter, of any services related to fire, blowout, explosion and/or other uncontrolled flow of oil, gas, water or other substances, including but not limited to, regaining control of any wild well located in any of the storages owned by ENAGAS in Spain.
Plazo
El plazo para la recepción de ofertas era de 2019-06-19.
La contratación se publicó en 2019-06-03.
Anuncio de licitación (2019-06-03) Autoridad contratante Nombre y dirección
Nombre: Enagas Transporte, S. A. U.
Dirección postal: Paseo de los Olmos, 19
Ciudad postal: Madrid
Código postal: 28005
País: España 🇪🇸
Correo electrónico: fjgalindo@enagas.es📧
Región: España🏙️
URL: www.enagas.es🌏 Comunicación
Acceso restringido a los pliegos de la contratación
URL de los documentos: https://enagas.bravosolution.com/web/login.html🌏
Objeto Alcance de la contratación
Título: Blowout Contingency Plan — Services for the Provision of Well Control Services
Productos/servicios: Servicios relacionados con la industria del gas y del petróleo📦
Breve descripción:
“The purpose of this service is the provision by Contractor to ENAGAS, upon request of the latter, of any services related to fire, blowout, explosion and/or...”
Breve descripción
The purpose of this service is the provision by Contractor to ENAGAS, upon request of the latter, of any services related to fire, blowout, explosion and/or other uncontrolled flow of oil, gas, water or other substances, including but not limited to, regaining control of any wild well located in any of the storages owned by ENAGAS in Spain.
1️⃣
Lugar de ejecución: España🏙️
Descripción de la contratación:
“Blowouts are the result of an uncontrolled flow of formation fluids into the atmosphere. During these events formation fluids could ignite and cause...”
Descripción de la contratación
Blowouts are the result of an uncontrolled flow of formation fluids into the atmosphere. During these events formation fluids could ignite and cause considerable damage to equipment and personnel. These situations require experienced personnel and specialized equipment to regain control of the well. It´ll be necessary that the contractor equipment has experienced personnel ready to respond to a multitude of different blowout/fire situations and has the firefighting equipment strategically placed worldwide for a rapid response.
When an incident occurs, the contractor will make initial contact with the client, assess the situation and then develop an action plan. The action plan will include the resources and equipment needed for the incident. The action plan will be reviewed with the client and once approved, will be activated. Operations during well blowouts include, but are not limited to, abrasive jet cutting, rig skidding/removal, casing head installation and capping operations. The majority of blowouts end with the installation of a capping stack, for that reason that operation is highlighted below.
Ver más Criterios de adjudicación
El precio no es el único criterio de adjudicación y todos los criterios se establecen únicamente en los pliegos de la contratación
Duración del contrato, acuerdo marco o sistema dinámico de adquisición
El plazo que figura a continuación se expresa en número de meses.
Descripción
Duración: 60
Procedimiento Tipo de procedimiento
Procedimiento restringido
Información administrativa
Plazo de recepción de las ofertas o solicitudes de participación: 2019-06-19 📅
Lenguas en las que pueden presentarse las ofertas o solicitudes de participación: inglés 🗣️
Lenguas en las que pueden presentarse las ofertas o solicitudes de participación: español 🗣️
“It will be an indispensable requirement for any company interested in participating in this process, to comply with the homologation procedure of Enagás.” Órgano de revisión
Nombre: Enagas Transporte SAU
Dirección postal: Paseo de los Olmos 19
Ciudad postal: Madrid
Código postal: 28005
País: España 🇪🇸
Fuente: OJS 2019/S 109-266924 (2019-06-03)