2016-02-26   Supply of mineral insulated (MI) terminated cables (The European Joint Undertaking for ITER and the development of Fusion Energy (‘Fusion for Energy’))
This contract is for the supply of mineral insulated (MI) terminated cabling needed by Fusion for Energy to perform a testing programme with respect to the ITER environment. The required supply includes 3 twin core terminated cables and 3 quad core terminated cables (each with a length of 10 metres). 5 separate and mutually exclusive lots are expected to be awarded to 5 separate tenderers. See invitation to tender documentation (ref. F4E-OPE-0746) for further details. Please note that Fusion for Energy … Ver la contratación »
Proveedores mencionados: Centronic Limited Thermocoax SAS