Adquisiciones: Trabajos de construcción de inmuebles (página 36)
2012-04-27
Magnet power conversion buildings (32-33) and reactive power control building (38) (
The European Joint Undertaking for ITER and the Development of Fusion Energy ("Fusion for Energy"))
The scope of the contract covers all activities from preliminary design (study of basic documents, development of technical specifications and drawings (CATIA models included)), to the construction, testing and take-over by the employer of the magnet power conversion buildings (numbers 32 & 33) and the reactive power control building (number 38).
The above includes the foundations, main structure, earthing and lightning protection systems, all finishing works (cladding, doors, metal works, partitions, …
Ver la contratación »
Proveedores mencionados:
Ferrovial Agroman, S.A.
Búsquedas relacionadas 🔍
Proveedores:
Vías y Construcciones, S.A.
Dragados, S.A.
Constructora San José, S.A.
FCC Construcción, S.A.
FERROVIAL CONSTRUCCIÓN, S.A.
Ferrovial Servicios, S.A.
Acciona construcción, S.A.
Clece, S.A.
Vías y Construcciones, S. A.
Acciona Construcción, S. A.