2012-09-26   Cold & Hot Basin & Cooling Towers (67), Pumping Station (68), Heat Exchangers Building (69) and Water Treatment... (The European Joint Undertaking for ITER and the Development of Fusion Energy ("Fusion for Energy"))
The scope of the contract covers all activities from preliminary design (study of basic documents, development of technical specifications and drawings (Catia models included)) to the construction, testing and take-over by the Employer of the Cold & Hot Basin & Cooling Towers (67), the Pumping Station (68), the Heat Exchangers Building (69) and the Water Treatment Equipment Building (64). The above includes the foundations, main structure, earthing and lightning protection systems, all finishing works as … Ver la contratación »
Proveedores mencionados: Ferrovial Agroman SA