1 MW short-pulse gyrotron for the development of the European RF sources for ITER

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

The scope of the supply concerns the manufacturing design, manufacture of subassemblies, integration, overall assembly, conditioning and acceptance testing of 1 short-pulse gyrotron at 170 GHz and 1 MW of output RF power for the development of the EU RF source for ITER.
The deliverables are:
— manufacturing design (detailed drawings of subassemblies, manufacturing or purchasing specifications),
— short-pulse gyrotron including auxiliaries to interface with the KIT test facility (cooling, control and protection, pumping),
— specific tooling for the assembly and essential spares to cover the assembly and commissioning period shall be delivered on-site with the gyrotron.

Plazo
El plazo para la recepción de ofertas era de 2012-11-05. La contratación se publicó en 2012-09-18.

Proveedores
Los siguientes proveedores se mencionan en decisiones de adjudicación u otros documentos de contratación:
¿A quién?

¿Cómo?

Historial de adquisiciones
Fecha Documento
2012-09-18 Anuncio de licitación
2013-09-20 Anuncio de adjudicación de contrato