Fabrication of a standard semi-prototype of the ITER normal heat flux (NHF) first wall (FW) panels

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

This contract aims at manufacturing mock-ups and a semi-prototype of the FW panels, including activities needed for the development of the related fabrication technologies. The contract includes 2 tasks:
the first part involves development and manufacturing of 4 small-scale mock-ups, representative of the standardised normal heat flux (D-NHF) design;
the second part involves development and manufacturing of 1 semi-prototype, representative of the standardised normal heat flux (D-NHF) design.
In particular, the semi-prototype shall have beryllium tiles, CuCrZr heat sink layer and stainless steel backing plates joined by hot isostatic pressing (HIPping).

Plazo
El plazo para la recepción de ofertas era de 2012-06-11. La contratación se publicó en 2012-04-11.

Proveedores
Los siguientes proveedores se mencionan en decisiones de adjudicación u otros documentos de contratación:
¿A quién?

¿Cómo?

Historial de adquisiciones
Fecha Documento
2012-04-11 Anuncio de licitación
2012-05-23 Información complementaria
2012-10-05 Anuncio de adjudicación de contrato