High heat flux testing of Faraday screens and EHF first wall semi-prototypes

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

This procedure concerns the supply of the high heat flux (HHF) testing of Be-armoured mock-ups and semi-prototypes, each at defined heat flux levels and number of cycles. The tests are divided into 2 sets.
The objective of the first set of tests, concerning 3 mock-ups, is to determine mock-up performance in support of the development of an enhanced heat flux (EHF) first wall (FW) design.
The objective of the second set of tests is to qualify the components' performance and manufacturing route chosen for the Faraday screen (FS) of the ITER ion cyclotron heating and current drive (ICH&CD) antenna.

Plazo
El plazo para la recepción de ofertas era de 2012-08-29. La contratación se publicó en 2012-06-28.

Proveedores
Los siguientes proveedores se mencionan en decisiones de adjudicación u otros documentos de contratación:
¿A quién?

¿Cómo?

Historial de adquisiciones
Fecha Documento
2012-06-28 Anuncio de licitación
2012-11-22 Anuncio de adjudicación de contrato