Provision of design activities for the design of the cooling plant for the 4 electron cyclotron upper launchers

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

Design activities of the cooling components both inside and outside of the ITER vacuum vessel. In particular it includes:
(1) the design of the cooling water distribution system of 4 electron cyclotron upper launchers;
(2) the design of the cooling water distribution system of electron cyclotron equatorial launcher;
(3) the design of the water manifold for the cooling of all the EU gyrotron components and gyrotron auxiliaries.

Plazo
El plazo para la recepción de ofertas era de 2014-09-08. La contratación se publicó en 2014-07-31.

Proveedores
Los siguientes proveedores se mencionan en decisiones de adjudicación u otros documentos de contratación:
¿A quién?

¿Cómo?

Historial de adquisiciones
Fecha Documento
2014-07-31 Anuncio de licitación
2015-05-07 Anuncio de adjudicación de contrato