2014-11-07Emergency electrical power distribution (TB13) (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The scope of the contract includes the delivery of electrical, nuclear qualified protection important components (PICs) (also referred to as safety important component (SIC)) distribution equipment and buildings associated with that equipment. The scope of the contract is broken down in the following activities:
1. construction design, delivery, installation, commissioning and maintenance of the following electrical equipment:
— PIC electrical distribution equipment,
— 15 kV equipment for back-up from …
Ver la contratación »