2021-06-09   Ejecuci贸n de las obras de ampliaci贸n de la longitud a 750 metros de los apartaderos de Campillos y Setenil en el... (Administrador de Infraestructuras Ferroviarias)
Ejecuci贸n de las obras de ampliaci贸n de la longitud a 750 metros de los apartaderos de Campillos y Setenil en el tramo Bobadilla-Ronda. Ver la contrataci贸n 禄
Proveedores mencionados: COMSA S.A.U.
2012-01-18   Site infrastructure works (TB08) (The European Joint Undertaking for ITER and the Development of Fusion Energy ("Fusion for Energy"))
The contract is for site infrastructure works. The works comprise the detailed design, construction and testing of vacuum systems for industrial and sanitary drainage, gravity rainwater drainage, trenches, ducts, concrete galleries, concrete foundations for equipment, roads, footpaths, external lighting, fencing and site-wide earthing grid. Ver la contrataci贸n 禄
Proveedores mencionados: COMSA S.A.U.