2014-08-29Site infrastructure works (TB14) (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The contract is for site infrastructure works. These works comprise the performance of the execution design, procurement and construction of the following:
Concrete service trenches (galleries):
— internal dimensions (width in mm x height in mm) ranging from: smallest 2 200 x 1 650, largest 2 700 x 5 500 and 4 300 x 2 850,
— average thickness of the walls: 300 mm,
— length of service trenches to be implemented: 3 000 lm.