2014-08-29Site infrastructure works (TB14) (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The contract is for site infrastructure works. These works comprise the performance of the execution design, procurement and construction of the following:
Concrete service trenches (galleries):
— internal dimensions (width in mm x height in mm) ranging from: smallest 2 200 x 1 650, largest 2 700 x 5 500 and 4 300 x 2 850,
— average thickness of the walls: 300 mm,
— length of service trenches to be implemented: 3 000 lm.
Precipitation drainage:
— concrete pipe works.
Special foundations:
— reinforced …
Ver la contratación »
2012-12-13“Recuperación Integral y Sostenible de la Frontera, Frontera_Natural”. Expediente nº5 (Agrupación Europea de Cooperación Territorial Duero-Douro)
Frontera_Natural tiene como objetivo la recuperación, conservación y revalorización del patrimonio natural en base al establecimiento de una Política Pública Común que favorezca la gestión conjunta del territorio, contribuyendo así al desarrollo sostenible del mundo rural transfronterizo. Para ello, lleva a cabo diferentes acciones conjuntas de protección, conservación y valorización del medio ambiental y de los recursos naturales, así como la planificación y gestión conjunta de los recursos humanos y …
Ver la contratación »