2013-03-26   Electron cyclotron power supply for ITER (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
This contract concerns the design, fabrication, on-site installation and commissioning of the HV power supplies corresponding to the EU contribution to the electron cyclotron heating and current drive system of ITER. The supply is organised in 8 sets, with a single set formed by 1 main HV power supply feeding the RF source (gyrotron) cathode with voltage and current, and 2 body HV power supplies establishing the total gyrotron acceleration voltage. It includes the dummy loads and auxiliaries to provide … Ver la contratación »
Proveedores mencionados: Ampegon AG Ampegon Power Electronics AG
2013-03-25   Procurement of the water detritiation system tanks, including final design (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
Acquisition of services and hardware supplies related to procurement of the tritiated water holding tanks and emergency tanks in conformity with the terms provided in the tender specifications, the management specification (Annex A) and the technical specification (Annex B). Ver la contratación »
Proveedores mencionados: Equipos Nucleares SA
2013-02-14   Fabrication of ITER divertor cassette bodies (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
This contract aims at manufacturing a cassette body prototype and up to 60 cassette bodies that make up the series, together with related pins, sleeves and links. The prototype will be included in the baseline of the contract and is required for the pre-production qualification. Ver la contratación »
Proveedores mencionados: Constructions Industrielles de la Méditerranée Hollming Works Ltd Walter Tosto SpA
2013-01-07   Engineering integrator — ITER poloidal field coils PF2, PF3, PF4, PF5 and PF6 (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The engineering integrator shall provide the engineering integration services for the supply of the poloidal field coils (PF2 to PF6 coils) as described in Section 2 of the technical specifications. The coils are wound adjacent to the ITER site in a dedicated PF coil fabrication building and handed over to F4E for cold testing and assembly in the ITER machine. Cold testing is considered to be the final acceptance test before handing over the coils to the ITER organisation for final assembly in the … Ver la contratación »
Proveedores mencionados: ASG Superconductors SpA ASG Superconductors SpA.
2013-01-03   Preliminary design of the water detritiation system, excluding tanks (main WDS) (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The service shall cover the preliminary design of the water detritiation system (WDS) of the ITER tritium plant, excluding tanks (main WDS); i.e. the 'entire' WDS without the large tanks (volume ≥ 20 m) and their flanges, however including the connecting pipework and the diagnostics for each tank. Ver la contratación »
Proveedores mencionados: Kraftanlagen Heidelberg
2012-11-23   Services in the area of project management (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
Provision of support to the F4E ITER Department and Project Office Unit in the area of project management, and more specifically in the activities related to risk management, configuration management, system engineering, project management systems, cost management and CE marking directives. Ver la contratación »
2012-10-23   Conceptual design of the hydrogen isotope separation system (HISS) (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The objective of this contract is to develop a conceptual design of the whole hydrogen isotope separation system (ISS) with the required documentation taking into account all interfaces, building layouts and ITER requirements. Ver la contratación »
2012-10-03   Supply of the liquid nitrogen plant and auxiliary systems (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The scope of this contract is to supply the engineering, supervision of installation (with the execution as an option) and testing of the liquid nitrogen (LN2) plant and auxiliary systems in accordance with the management specification (Annex A) and technical specification (Annex B). The contract will include the delivery of an LN2 plant as well as auxiliary systems such as 2 × 80 K loops, helium storage tanks, a purification system, dryers and heaters. The execution of the contract is divided into the … Ver la contratación »
Proveedores mencionados: Air Liquide Engineering Air Liquide Global E&C Solutions France S.A. Air Liquide Global E&C Solutions France SA
2012-09-18   1 MW short-pulse gyrotron for the development of the European RF sources for ITER (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The scope of the supply concerns the manufacturing design, manufacture of subassemblies, integration, overall assembly, conditioning and acceptance testing of 1 short-pulse gyrotron at 170 GHz and 1 MW of output RF power for the development of the EU RF source for ITER. The deliverables are: — manufacturing design (detailed drawings of subassemblies, manufacturing or purchasing specifications), — short-pulse gyrotron including auxiliaries to interface with the KIT test facility (cooling, control and … Ver la contratación »
Proveedores mencionados: Karlsruhe Institute of Technology
2012-09-04   Global transport and insurance services in support of the Broader Approach Agreement for the development of fusion power (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
This framework contract will cover the following on-demand services: — global air freight, — global transportation of containerised goods and sub-container loads, — 'ad valorem' insurance of transported goods. Most routes will be between locations in Europe and Japan. Ver la contratación »
2012-07-26   Manufacturing of blanket cooling manifold prototypes (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
Manufacture and supply of prototypes of the ITER blanket cooling manifold (BCM) system. The prototypes are as follows: 1) a full prototype of a standard 20 degree inboard sector, including the inlet and outlet pipe bundles and the coaxial connectors; 2) a partial bundle of the outboard region. Ver la contratación »
Proveedores mencionados: Dockweiler AG
2012-06-28   High heat flux testing of Faraday screens and EHF first wall semi-prototypes (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
This procedure concerns the supply of the high heat flux (HHF) testing of Be-armoured mock-ups and semi-prototypes, each at defined heat flux levels and number of cycles. The tests are divided into 2 sets. The objective of the first set of tests, concerning 3 mock-ups, is to determine mock-up performance in support of the development of an enhanced heat flux (EHF) first wall (FW) design. The objective of the second set of tests is to qualify the components' performance and manufacturing route chosen for … Ver la contratación »
Proveedores mencionados: Alphysica GmbH
2012-04-11   Fabrication of a standard semi-prototype of the ITER normal heat flux (NHF) first wall (FW) panels (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
This contract aims at manufacturing mock-ups and a semi-prototype of the FW panels, including activities needed for the development of the related fabrication technologies. The contract includes 2 tasks: the first part involves development and manufacturing of 4 small-scale mock-ups, representative of the standardised normal heat flux (D-NHF) design; the second part involves development and manufacturing of 1 semi-prototype, representative of the standardised normal heat flux (D-NHF) design. In … Ver la contratación »
Proveedores mencionados: Iberdrola S.A.U (Leader) (plus AMEC...
2012-03-30   Transport of the JT-60SA cryostat base from Spain to Japan (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The present call for tenders covers the transport of the JT-60SA cryostat base from Spain to Japan. This contract will cover: — collection of the components from the manufacturer's factory in Spain, — transport of the components to Hitachi port in Japan, — as an option, insurance for the full value of the components. Ver la contratación »
2012-03-16   Manufacturing of the pre-production cryopump (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The scope of supply of this procurement is divided into 3 lots: 1. the first one consists of a range of activities which culminate in the delivery of the pre-production cryopump (PPC). The related tasks are described in more detail below; 2. the second one consists of the manufacturing of the hydroformed components required for the manufacturing of the PPC; and 3. the third consists of the charcoal coating of 30 cryopanels for the PPC and related documentation and qualification work. Ver la contratación »
Proveedores mencionados: Karlsruhe Institute of Technology (KIT) RI Research Instruments GmbH SDMS
2011-12-21   High heat flux testing of mock-ups and pre-qualification inner vertical target prototypes (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
The contract covers the preparation and the performance of the high heat flux (HHF) thermal fatigue testing of: — 20 W mock-ups, — 16 CFC mock-ups, — 2 W IVT pre-qualification medium-scale prototypes. It also covers the manufacturing and the critical heat flux (CHF) testing of 5 so-called 'CHF mock-ups'. The work shall be spread into 4 tasks, as described hereunder: 3 of the tasks (tasks A to C) shall consist of the thermal fatigue testing of the following list of components. — Task A: 16 CFC mock-ups, … Ver la contratación »
Proveedores mencionados: Areva N.P. s.a.s
2011-10-30   High heat flux test facility for in-vessel components (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
This procedure concerns the provision (possibly design, procurement and commissioning or alternatively the upgrade of an existing facility) of a high heat flux (HHF) test facility for ITER in-vessel components (IVC), principally the blanket first wall (FW) panels. Additional IV components may also be tested including the divertor inner vertical targets and ICRF antenna screens. The services concern: Initially, this facility will be dedicated to the series acceptance tests of the IVC which are part of the … Ver la contratación »
Proveedores mencionados: Centrum Vyzkumu Rez
2011-04-01   High heat flux tests of ITER first wall mock-ups (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
A series of high heat flux (HHF) tests of up to 18 ITER first wall mock-ups with beryllium (Be) armour. Ver la contratación »
Proveedores mencionados: Alphysica GmbH
2011-02-11   Provision of system and instrumentation engineering support (The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy'))
This framework service contract concerns the provision of professional services in the field of instrumentation and control system engineering and aims to support Fusion for Energy in the preparation of technical specifications and the follow-up of in-kind contributions to ITER. Ver la contratación »